logo solar power systems wit 500

Solar panels

Solar panels convert sunlight into electricity, which powers your systems and devices. If the generated electricity is not sufficient, for example at night, the required additional electricity is automatically drawn from the regular main grid. If there is a surplus of generated electricity, it is fed back into the main grid.

A significantly lower electricity bill

With solar panels, you can easily save 70 to 90% on your electricity costs, depending on your electricity consumption. With the addition of battery storage, you can even become completely independent of the main grid.

Compensation for surplus electricity

For the surplus electricity you feed back into the main grid, you receive compensation from your electricity provider. In Spain, these compensations are relatively high, particularly compared to most Northern European countries.

Designed for Spain

Our solar panels are designed for the Spanish climate, characterized by high summer temperatures.

Short payback period

Our customers typically recover their investment within an average of 5.5 years.

Installed in one day

We install most systems within a single day.

The best materials

We offer 24/7 support, and if your system is connected to the internet, we continuously monitor it.

Assembly quality

We use only the highest quality materials, ensuring your solar panels can easily withstand even the harshest weather conditions.

Licenses and permits

Our systems meet all requirements and come with all necessary certificates and permits.

Warranties

We offer up to 25 years of warranty and ensure quick processing of warranty claims.

Attention to aesthetics

We place great importance on a neat finish with no visible cables and minimal aesthetic impact.

Experience with all types of roofs

We have extensive experience with all types of roofs, from new-build homes to historic fincas.

Ready for the future

Our solar panel systems can always be expanded with additional panels, battery storage, backup solutions, and charging stations.

24/7 support

We offer our customers 24/7 support, and if your system is connected to the internet, it is continuously monitored.

Combinations

We often combine solar panels with other renewable systems to further reduce electricity costs.

Why Solar Power Systems?

Since our start in 1994, we have had one goal: to make the most of the sun hours in this region. Over the years, we have helped more than 35,000 customers and have become a trusted name on the Costa Blanca.

  • Expertise: With over 30 years of experience on the Costa Blanca, we have closely witnessed the growth and development of solar panel installations in Spain.
  • A trusted name on the Costa Blanca: With a customer base of over 35,000, we are a well-established name in this region.
  • Experience: Since the abolition of the “impuesto del sol” in 2019, we have completed over 2,000 solar panel installations, making us the most experienced installer in this region.
  • A long-term partner: We proudly celebrate our 30th anniversary and look forward with confidence to the coming decades as your trusted partner.
  • Local presence: To ensure the quality our customers have trusted for 30 years, we have reduced our working region and keep waiting lists in this area short.
  • Local commitment: We are actively involved in the local community and contribute to the renewable development of the region.
  • Personal approach: We take the time to understand your wishes and situation, ensuring we provide a solution that perfectly meets your needs.
  • Multilingual: Our team speaks Dutch, English, German, Spanish, French, and Polish, ensuring we can always support you in your own language.
  • In-house staff: Our teams consist of our own electricians, plumbers, and installers.
  • Knowledge and certification: Our installers are fully qualified electricians, have undergone extensive training, and are FEMPA-certified.
  • Administrative support: Our multilingual administrative team handles all paperwork for you and is always ready to answer any questions.
  • Collaboration: We are used to seamless cooperation with construction companies, architects, real estate agents, rental agencies, and property managers.
  • Innovation: We continue to invest in the latest technologies and solutions, ensuring our customers benefit from the most advanced and efficient systems.
  • Information: We help you find the best electricity provider, so you can benefit from even lower electricity bills.
  • After-sales service: Our service doesn’t stop after installation. We offer comprehensive after-sales support for maintenance and optimization.
  • Competitive prices: Due to the large number of installations we carry out, we are able to offer the most competitive prices on the Costa Blanca.
  • Transparant pricing: We use transparent and honest pricing, with no hidden fees for administrative tasks or extra work.
  • Subsidies: We provide you with realistic and clear information about subsidies.
  • Customer reviews: Our customers rate us 4.9 out of 5 stars, based on over 200 Google reviews.
  • Physical store/office: Visit our store/office on the Calpe-Moraira coastal road, where you are always welcome for information and support.
  • Environmental friendliness: We use eco-friendly work methods and ensure the sustainable disposal and recycling of old systems.

Indicative prices

Indicative prices for our most popular all-in-one grid-connected solar panel packages, including all materials, services, installation, paperwork, and building permits. For other configurations or larger systems, please contact us. We would be happy to provide you with a detailed quotation.

All-in-one packages 89.99
Including:billed yearly
Huawei Hybrid Inverter - Expandable with more panels, battery storage, optimizer, smart EV chargers and back-up solutions - 10 year warrantyHuawei Hybrid Inverter - Expandable with more panels, battery storage, optimizer, smart EV chargers and back-up solutions - 10 year warranty
Huawei smart Power SensorHuawei smart Power Sensor
Longi Hi-Mo X6 MAX - Full-black - 505W - Premium tier 1 module - Full black panels (frame and surface area) - 505W - High efficiency: 22.4% - High temperature coefficient - 25 year linear power warranty - 25 year full product warrantyLongi Hi-Mo X6 MAX - Full-black - 505W - Premium tier 1 module - Full black panels (frame and surface area) - 505W - High efficiency: 22.4% - High temperature coefficient - 25 year linear power warranty - 25 year full product warranty
All electrical components (cabling, cabinets, switches, circuit breakers and more)All electrical components (cabling, cabinets, switches, circuit breakers and more)
Roof mounting materialsRoof mounting materials
All installation materialsAll installation materials
Installation and configurationInstallation and configuration
Apps and softwareApps and software
Reimbursements for surplus electricityReimbursements for surplus electricity
Registration of the system through the Generalitat ValencianaRegistration of the system through the Generalitat Valenciana
Legalization of the system via the grid-operatorLegalization of the system via the grid-operator
Building permits via the municipalityBuilding permits via the municipality
All paperwork for IBI discountAll paperwork for IBI discount
Electricity supplier comparison serviceElectricity supplier comparison service
Lifelong aftersales service and 24/7 supportLifelong aftersales service and 24/7 support
Optional:Optional:
OptimizersOptimizers
Battery-strorageBattery-strorage
Electric vehicle chargerElectric vehicle charger
Back-upBack-up
4G communication4G communication
3 kWp - 5.250 kWh per year
4.200 89.99
Including VATbilled yearly
5 kW (7,5 kWp) hybrid inverter5 kW (7,5 kWp) hybrid inverter
(6) 505W full-black solar panels(6) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 5.000 including IVAWith three phase components: € 5.000 including IVA
5 kWp - 8.750 kWh per year
5.150 89.99
Including VATbilled yearly
5 kW (7,5kWp) hybrid inverter5 kW (7,5kWp) hybrid inverter
(10) 505W full-black solar panels(10) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 5.950 including IVAWith three phase components: € 5.950 including IVA
7 kWp - 12.250 kWh per year
6.600 89.99
Including VATbilled yearly
6 kW (9 kWp) hybrid inverter6 kW (9 kWp) hybrid inverter
(14) 505W full-black solar panels(14) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 7.100 including IVAWith three phase components: € 7.100 including IVA
9 kWp - 15.750 kWh per year
8.250 89.99
Including VATbilled yearly
8 kW (12 kWp) hybrid inverter8 kW (12 kWp) hybrid inverter
(18) 505W full-black solar panels(18) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 8.050 including IVAWith three phase components: € 8.050 including IVA
11 kWp - 19.250 kWh per year
9.400 89.99
Including VATbilled yearly
10 kW (15 kWp) hybrid inverter10 kW (15 kWp) hybrid inverter
(22) full-black solar panels(22) full-black solar panels
Including building permitIncluding building permit
With three phase components: € 9.250 including IVAWith three phase components: € 9.250 including IVA
4 kWp - 7.000 kWh per year
4.700 89.99
Including VATbilled yearly
5 kW (7,5 kWp) hybrid inverter5 kW (7,5 kWp) hybrid inverter
(8) 505W full-black solar panels(8) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 5.500 including IVAWith three phase components: € 5.500 including IVA
6 kWp - 10.500 kWh per year
6.100 89.99
Including VATbilled yearly
6 kW (9 kWp) hybrid inverter6 kW (9 kWp) hybrid inverter
(12) 505W full-black solar panels(12) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 6.650 including IVAWith three phase components: € 6.650 including IVA
8 kWp - 14.000 kWh per year
7.050 89.99
Including VATbilled yearly
6 kW (9 kWp) hybrid inverter6 kW (9 kWp) hybrid inverter
(16) 505W full-black solar panels(16) 505W full-black solar panels
Including building permitIncluding building permit
With three phase components: € 7.600 including IVAWith three phase components: € 7.600 including IVA
10 kWp - 17.500 kWh per year
8.950 89.99
Including VATbilled yearly
10 kW (15 kWp) hybrid inverter10 kW (15 kWp) hybrid inverter
(20) full-black solar panels(20) full-black solar panels
Including building permitIncluding building permit
With three phase components: € 8.800 including IVAWith three phase components: € 8.800 including IVA
12 kWp - 21.000 kWh per year
9.900 89.99
Including VATbilled yearly
10 kW (15 kWp) hybrid inverter10 kW (15 kWp) hybrid inverter
(24) full-black solar panels(24) full-black solar panels
Including building permitIncluding building permit
With three phase components: € 9.700 including IVAWith three phase components: € 9.700 including IVA

Latest price update

January 24, 2025

Average waiting time for installation

12 weeks

Prices

The prices of these packages are based on installation on a sloping roof with roof tiles.

Additional costs for flat surfaces

Solar panels installed on flat roofs, carports, and pergolas are €18 including VAT per panel more expensive due to additional materials and transportation costs.

In all municipalities, an additional certificate is required to obtain building permits when solar panels are installed on a flat surface, such as on the ground, a flat roof, a pergola, or a carport. This certificate, known as the “certificado de solidez” (certificate of structural integrity), must be prepared by a certified engineer and costs 350 euros, including VAT.

Production values

The production of these packages is based on a southern orientation and a slope of 25 degrees.

Fixed prices

The prices in our quotations always include all necessary materials, services, paperwork, and building permits, and they never change. No fine print, no post-calculation charges, no unexpected costs for additional work after installation, and no surprise extra costs for administrative tasks.

Standardly included in the above prices:

Registration through the grid caretake

It is essential to follow the legalization process established by the network operator (I-DE). This process ensures the official authorization and recognition of feeding surplus electricity back into the grid, allowing you to receive compensation for your surplus electricity.

Registration through the grid caretake

It is essential to follow the legalization process established by the network operator (I-DE). This process ensures the official authorization and recognition of feeding surplus electricity back into the grid, allowing you to receive compensation for your surplus electricity.

Building Permit

For the installation of a solar panel system, a building permit must be applied for, paid for, and approved by the municipality. Installing solar panels without the required building permit may result in municipal fines, mandatory removal of the system, and complications when selling your property or applying for a rental license. We only carry out solar panel installations with a valid building permit approved by the municipality. We make no exceptions to this policy unless you choose not to have us arrange the building permit. In such cases, you will be required to sign a legally binding declaration confirming that we have informed you about the mandatory building permit, the significant risks of installation without a permit, and that we cannot be held liable for municipal fines, substantial additional costs, the possible mandatory removal of the installation, or costs arising during the sale of your property due to the lack of the permit.

Additional (administrative) costs in some municipalities

In some municipalities, including Altea, Alfaz/Albir, Benitatchell, Jalon, Javea, and Denia, relatively extensive additional paperwork is required to obtain building permits. This includes a “certificado de solidez” (certificate of structural integrity), an “estudio de seguridad y salud” (safety and health study), an “estudio de residuos” (waste study), a “proyecto descriptivo” (project plan), and “tasas del colegio oficial de ingenieros” (fees from the official college of engineers). All these documents and certificates must be prepared by a certified engineer. The cost for this is €835 including VAT.

When additional paperwork is required in your municipality to obtain a building permit, these administrative tasks are always included in your quotaton.

Referral bonus

Bring us in contact with new customers, such as friends, family, or neighbors, and receive an attractive referral bonus of €250! Visit our store together with the referred person and make sure to indicate who made the referral before placing the order (this cannot be indicated retroactively). Once the installation is ordered, you will receive €250 in cash or €350 off your next purchase!

Compensation for surplus electricity

When you generate more electricity than you need, the surplus is fed back into the main grid. Your electricity supplier compensates you for this surplus electricity. These compensations are settled monthly with the remaining amount you still need to pay, for example, for electricity consumed during the night. Some suppliers also offset these compensations against the fixed connection fees.

Electricity suppliers: Tailored Advice

Finding the right contract can be challenging for many, especially due to language barriers, the large number of providers, complex electricity bills, and frequently changing rates. We closely monitor the main Spanish electricity suppliers and offer tailored advice after installation. This is often beneficial, as many providers have attractive offers for people with solar panels.

If you reside permanently in Spain, we generally recommend a contract with the lowest electricity rates and the highest rates for surplus solar electricity. When you do not stay in Spain year-round, we usually recommend a contract with a virtual battery.

We also always recommend a supplier that offsets the compensation for surplus electricity with both the consumed electricity and the fixed connection costs.

Discount on property tax (IBI)

In most municipalities, homeowners have the opportunity to benefit from a reduction in property tax (IBI). You do not need to be a resident of Spain to be eligible for this discount. Because municipalities are allowed to determine and adjust the duration and amount of the discount themselves, we cannot list the exact discount amount per municipality on our website. However, the discount is substantial. For example, in most municipalities, it amounts to 25 to 50% per year over a period of 3 to 5 years. We provide all the necessary documentation to obtain the discount, including:

  • Licencia de obras
  • Informe favorable
  • Carta de pago de las tasas
  • Certificado de instalación eléctrica en baja tension
  • Memoria técnica
  • Certificados de garantía
  • Certificados de conformidad de la UE
  • Fichas técnicas

We send these documents after the installation in a clear email with an explanation of the content of each document, making the process of applying for the IBI discount at your local SUMA office simple and quick.

Components in a solar panel system:

zonnepanelen longi calpe solar power systems

Solar panels

Solar panels convert sunlight into electricity through photovoltaic cells. When selecting our panels, we focus on technology, efficiency, reliability, design, and warranty. Our panels are carefully chosen based on over 30 years of experience on the Costa Blanca, data from more than 2,000 solar panel systems installed by us in this region, test results from independent laboratories, and our own tests conducted at our facilities in Calpe under realistic conditions, including the impact of Sahara sand, high summer temperatures, and varying maintenance scenarios.

Depending on the available space, we use Hi-MO X6 and X6 Max panels from Longi, the world’s largest manufacturer of solar panels. Longi is renowned for its reliability, quality, and long warranties, as well as being a leader in technological innovation. The Longi X6 435W panel (22.3% efficiency – 113 x 173 cm) and the X6 Max 505W panel (22.4% efficiency – 113 x 199 cm) deliver high performance combined with a sleek, fully black design that ensures a modern and stylish appearance.

These panels, with HPBC technology, perform very well in the summer at hot summer temperatures thanks to their optimized energy conversion efficiency and low temperature coefficient, meaning they experience minimal yield loss as the temperature increases. Additionally, the Hi-MO X6 and X6 Max panels both offer a 25-year power and product warranty.

Inverter

An inverter is an electronic device that converts direct current (DC) generated by solar panels into alternating current (AC) used in homes. Additionally, the inverter can feed surplus electricity, not immediately consumed in the household, back into the power grid.

We primarily work with string inverters, optionally in combination with optimizers. With a string inverter, a single central inverter is installed, typically in a technical room, garage, or outdoors. Our range includes premium hybrid string inverters that can be expanded with additional solar panels, battery storage, smart charging stations, backup solutions, and smart grid functionalities. For over five years, we have been using Huawei inverters due to their reliability, compact size, quiet operation, user-friendly app, excellent value for money, and long warranty.

omvormer calpe solar power systems
zonnepanelen optimizers calpe solar power systems

Optimizers (optional in most situations)

Optimizers (Huawei Smart Module Controllers) work in conjunction with the inverter to optimize the performance of individual solar panels, ensuring maximum efficiency of the solar panel system. Thanks to the optimizer, the system can generate more electricity, even if some panels temporarily perform less efficiently due to shading effects. An additional advantage of an optimizer is that you can monitor the individual performance of each panel via the solar panel system’s app.

Optimizers are not always necessary and will only be offered by us when required for the proper functioning of the solar panel system or if you wish to monitor the individual performance of each panel.

An optimizer costs €65, including VAT and installation.

Battery Storage (Optional)

Battery storage (Huawei Smart Storage) provides the capability to store electricity generated during the day in batteries for use during periods of low or no sunlight, or when your home temporarily requires more electricity during the day than the solar panels are producing at that time.

  • Starting at 7 kWh
  • Modular expandable in increments of 5 kWh
  • With 7 kWh of storage, the battery can deliver 3.5 kW
  • With 14 kWh of storage, the battery can deliver 7 kW
  • With 21 kWh of storage, the battery can deliver 10.5 kW
  • 15 year warranty

Prices including installation and VAT:

  • Base module + 1 x 7 kWh module: €5,300 (€760 per kWh)
  • Base module + 2 x 7 kWh modules: €9,000 (€640 per kWh)
  • Base module + 3 x 7 kWh modules: €12,650 (€600 per kWh)
zonnepanelen batterijopslag calpe solar power systems
zonnepanelen laadstations calpe solar power systems

Charging station (optional)

The Huawei Smart Charger is an advanced charging station for electric vehicles that can communicate with the solar panel system.

  • Charging capacity from 1,4 kW to 22 kW
  • Optimizes the use of solar energy
  • Combine solar and grid power for fast charging times
  • Charging times, charging methods, and charging capacity can be easily adjusted remotely via the app

Prices including installation and VAT:

Single-phase: €1,300

Three-phase: €1,590

Back-up (optional)

The Huawei Smart Guard is an advanced backup solution for homes, designed to ensure a continuous electricity supply during power outages. The Smart Guard automatically switches from grid power to battery electricity within 20 milliseconds after a power outage. This ensures that household appliances continue to operate without noticeable interruption.

Prices including installation and VAT:

Single-phase: €2,320

Three-phase: Expected in the first quarter of 2025

The Huawei Smart Guard is compatible with virtually all Huawei inverters installed by us and can always be added to existing systems later.

zonnepanelen back-up calpe solar power systems

Mounting systems

zonnepanelen hellende daken calpe solar power systems
zonnepanelen vlakke daken calpe solar power systems
zonnepanelen carports calpe solar power systems
zonnepanelen muren calpe solar power systems

Sloping roofs

For the installation of solar panels on pitched roofs with roof tiles, we use a mounting system specifically designed for the distinctive Spanish roofs and tiles.

Flat roofs

For flat roofs and gardens, we use prefab concrete foundations of high-quality concrete.

Depending on the situation, we opt for rows of panels with sufficient spacing to prevent shading or a “sail system.” In this system, the panels are placed directly behind each other, slightly elevated, ensuring they don’t cast shadows on one another and eliminating the need for spacing between panels.

Pergolas and carports

For pergolas and carports, we use aluminum structures.

Note: To obtain a building permit for solar panels on a carport, nearly all municipalities require a minimum distance of 5 meters between the panels and the property boundary. Additionally, we can only apply for the permit if the carport is registered in the land registry, which we can verify for you.

Walls

Solar panels can also be installed on walls using aluminum structures.

The most complete all-in-one app

Huawei Fusion Solar

Production

View information about the production of your solar panels.

Consumption

View information about the electricity consumption of your home.

Main power grid

See what you are still taking from the main power grid.

Surplus electricity

See how much surplus electricitu you have injected into the main power grid.

zonnepanelen app calpe solar power systems
Financial data

See how much you save and the speed at which you recover your investment.

Optimizers

View information about the performance of individual solar panels.

Battery storage

View information about the charging and discharging of batteries.

Charging stations

Control the charging station for your electric vehicle.

zonnepanelen app 2 calpe solar power systems

Huawei Smart PV

Experience perfect communication and seamless collaboration between all your devices within one system, accessible through a single app.

  • Smart Energy Controller (inverter)
  • Smart Module Controller (optimizers)
  • Smart Storage (barrery storage)
  • Smart Charger (charging station electric vehicles)
  • Smart Guard (backup during power outages)
  • EMMA (AI smart grid – energy management assistant)

Frequently Asked Questions – FAQ

Where do you install?

As of January 1, 2023, we have reduced our service area in order to continue meeting the high demand and maintain the top-notch service that our customers have come to expect from us over the past 30 years. We are active in the Marina Baja and Marina Alta, from Denia to Villajoyosa, in cities and towns such as Javea, Benitatchell, Teulada, Moraira, Benissa, Jalon, Lliber, Alcalali, Calpe, Altea, Alfaz, Albir, and Benidorm.

Do the panels have to be cleaned?

Cleaning solar panels when they are dirty increases production. We recommend cleaning your panels at least once a year. You can do this yourself with a soft brush or cloth, or you can leave it to one of our professional partners, who offer special rates to Solar Power Systems customers. Contact us for more information and contact details.

Do solar panel systems need maintenance?

Besides cleaning the panels, solar panel systems do not require any maintenance.

What if roof tiles break during the installation?

We replace any roof tiles that get damaged during the installation process.

Do you offer financing options?

Yes, we offer financing options.

What makes your prices so competitive?

Our prices are highly competitive due to the large number of systems we install. This allows us to work efficiently and pass the cost savings directly on to our customers. Additionally, we handle all paperwork in-house. For building permits, we do not work through administrative offices, but maintain direct contact with the relevant municipalities.

Do you install systems I bought myself?

No, we do not install materials purchased independently.

Do you do paperwork for third-party systems?

No, we generally do not handle paperwork for third-party systems, but exceptions can be made in certain cases. For this, you need to visit us in person with all relevant documents and information about the system. We will discuss and assess your situation to determine if we can support you, provided there are no outstanding fines for unrequested building permits or other mandatory administrative requirements.

Customer reviews

zonnepanelen google calpe solar power systems

Visit our Google company page for over 200 reviews.